The most recent achievement was civil works at ST-1 for HKN client, the work activities covered dividing an existent water pit by an earth berm and lining the major pit division by HDPE liner.
This job was a sensitive as it was carried out at PF-1 where the surroundings were very crowded with pipe assembles fixed and mobile machines, however we did a safe without conflict job.
The other activity was constructing an access road joining PF-1 with the Flare pit.
We constructed a Flare pit as well by digging about two meters in a mountainous rocky terrain and extended one meter the perimetric wall over the natural ground level.
The flare pit was then lined by reinforced concrete.